Welcome To Reiki Sanctuary, The Blog


The Voices of My Soul


I enjoy writing. It relaxes me.
It makes me to take charge to nurture my mind and spirit.
It is far better than the burden of thinking and talking.
Writing is self discovery. Writing is a way towards my self-conviction:
I Become What I Think About. The Me I See, The Me I Will Be.

My writings are my way to communicate with the Universe.
They are my expressions of my inner voice. They are voices of my soul.
Often, they are about little prayers for my development, growth and well being.
Often, they are meant to shape my spirituality. [>> Click To Read More]



Translate Reiki Sanctuary:
Showing posts with label cabinet. Show all posts
Showing posts with label cabinet. Show all posts

Wednesday, October 08, 2008

Renovation - Week 13B


We are making a trip down to Reiki Sanctuary often these few days - almost daily.  Haha, basically we want to check on the progress.  To kaypoh that works are done.  To make sure that there is no more hiccup.  To show our urgency to move in. 

We feel it is also a good thing to do as we will be able to communicate with the workers.  To let them rectify any defective works there and then.  At the same time, we are trying to minimise any additional works for Chiauw.  When we are able to communicate directly with the workers, Chiauw does not have to be the middle person to do that task.

We are expecting more works in the house this week.  The 'Wet Area' Kitchen cabinet will be delivered today and, guess, it will be fixed immediately.  Tomorrow, Alumix will send the door for the Guest Room wardrobes.  We hope to see the glasses and mirrors fixed too.

Works completed, or near completion, so far:

Master Toilet
The granite top is up but there are still more works to be done:

-  Fixing mirror
-  Fixing glass
-  Fixing Vanity drawers
-  Fixing sanitary bowl and tap mixer
-  Fixing LED lights under Vanity top
-  Fixing lights above Vanity top


Guest Room

The wardrobe structure and the window low bench are completed and waiting for the Alumix sliding door and cushion seat respectively.




Dining Area

The wardrobe, which was fixed to conceal the aircond trunkings and ledges are completed.  Now waiting for the electrician to fix the LED light along the ledges.

Main Gate

The main gate was being installed as we left.  Here, is the one end of it:


Guest Toilet


The toilet paper holder and hand towel hanger have been fixed.  We are not sure what is Chiauw going to do with the boxed-up.  Our understanding is that it would be covered with glass.  As such, we don't quite get it why the hangers were already fixed.


Study Table

The last instruction that we gave to Chiauw was not to get Uncle Chong fixed the top hung study cabinet.  We decided to drop the idea so as to avoid delay.




Look at how kiasu we are with all the electrical plugs:






Monday, September 22, 2008

Walk With Me


Dear Uncle Chong,

Please walk with us again and, please please give us more reassurances. 

We were a little shocked when we went down to the site yesterday.  We are not complaining about the quality of your works but we observed that the joinery works in the Master Bedroom / Study Area and the Living Room TV Console were far from completed.  Our heart dropped and the next thing that popped in our mind was the big question if we can move in as planned.

Didn't we agree that the works should finish on Saturday, 20th September? 

What happened, Uncle Chong?  Yes, you deployed most of your workers and we saw eight of them working at the site on Thursday last week.  Yes, we also agreed with you that there is a huge amount of joinery works.  However, you had been briefed and agreed to undertake the project.  Plus, we had made 70 percent payment.

This week, you should be doing our kitchen cabinet and the joinery works for the Guest Room and the Dining area.  We hope that works at the site can start as soon as possible, preferably on Wednesday.  That will give you ample time to finish by the following Tuesday, the latest.  It is also the date that you had promised us where all the joinery works in the house should be completed.

You see, Uncle Chong, we are getting very worried - again.  We must admit that we are rather new to all these joinery works and, pardon us, if we sound rather apprehensive.  At the look of it, just for the works at the Master Bedroom and Study area, we figure that it will take more than two days to complete.  There seems to be a lot more works not done yet.

Can all the joinery works in the house be completed by 30th September as promised earlier?

These are the changes that need to be rectified:

01.  The entrance to the Master Toilet

We decided to do away with the double panel.  The Recycled Wardrobe will stay but the wood panel at the vanity area need to be taken off.  It is just ugly! We want it to be replaced with a half length, from floor to top of vanity, with a 12 mm clear glass.


02.  Master Wardrobe

We need more space for hanging our clothes.  There should be another hanging pole at where the drawers are.  You need to cover the existing holes.


03.  Suspended TV Consoles at Living Room and Master Bedroom

Just for the record, we just feel that the consoles are too low from the floor and they don't look 'suspended'.  However, after you had explained to us about the 'hollow' wall, we will accept them.


Uncle Chong, you need to know that there are still few outstanding works that need to be carried out after your completion.  Chiauw needs few days for other trades to commence works.  These are other works waiting till you are done:

01.  The granite guys to install the granite for the vanity tops at Master and Guest Toilets.
02.  The plumber to install the tap mixers.
03.  The ceiling guys to fix the false ceiling at the entrance of the study area.  This is an extra work as you needed to open the false ceiling to lay tracks for the sliding door.
04.  The electrician to lay socket points at where you have created the flushed walls.
05.  The painters to give the final coat.
06.  The last vanishing to the chengal wood.
07.  The installation of the main gate.
08.  The installation of the kitchen sink, kitchen hob and island hood.
09.  General clean-up before Chiauw can finally hand us the house.

We hope you can understand our problem.  We have to vacate our place by 6th October.  Definitely, it will cause great inconvenience to move in when the house is still in a big mess.  We also don't wish other renovation works to be carried out when we are staying there.

Yours Sincerely,





Wednesday, May 07, 2008

Creative Juices

Ah, internet makes it easier for you to find information.  And when it comes for house renovation, it is also a place where you 'suck' creative juices from the high end manufacturers and get your contractors to custom make for you. 

However, it is important to remember that copyright is also an issue.  As much as I am respecting the works of these creative people, it is only polite - should I want to copy - not to go overboard.

Some of the items that caught my eyes:

Bed set with side tables


It would be nice to have a boxed bed head with lights shining up.  Also to extend, on the bed front, a small sitting area.

Cabinet Sliding Door


Find it neat.  Also, like the colour.


Floating TV Console




    About Me

    I am a certified Master in Traditional USUI REIKI and KARUNA REIKI. I am also a certified practitioner in MAGNIFIED HEALING and INNER DANCE.

    I have been teaching and conducting spirituality, healing and energy works (including Breathing Techniques, Meditation and Spinal Qiqong) for more than two decades.

    These are the classes I conduct:
    (for Individual and/or Groups)

    a) Life / Motivational Coach
    b) Usui Reiki (all the 4 levels)
    c) Awareness Before Change
    d) Born Rich
    e) Tibetan Geomancy ** (reading and consultation)

    ** Please have your house plan


    ABOUT REIKI SANCTUARY

    In Reiki Sanctuary, we feel blessed. We feel the abundance and greatly appreciate for all that have been showered. We can only keep counting ..

    [Continue Reading ...]



    CONTACT ME



    All emails are private and confidential


    Need Healing?

    I offer Reiki Distant Healing (See REIKI HOSPITAL OF LIFE for more information) for those who seek healing, higher & spiritual guidance.

    Do contact me should you want me to add you to this healing space. You might want to share your issues via email.

    I do not charge for doing this service; there is no fee involved. My intention is pure as I truly believe it is always good that we can attain to be with our Highest Self.

    We deserve to be healthy, peaceful and joyful.