We are making a trip down to Reiki Sanctuary often these few days - almost daily. Haha, basically we want to check on the progress. To kaypoh that works are done. To make sure that there is no more hiccup. To show our urgency to move in.
We feel it is also a good thing to do as we will be able to communicate with the workers. To let them rectify any defective works there and then. At the same time, we are trying to minimise any additional works for Chiauw. When we are able to communicate directly with the workers, Chiauw does not have to be the middle person to do that task.
We are expecting more works in the house this week. The 'Wet Area' Kitchen cabinet will be delivered today and, guess, it will be fixed immediately. Tomorrow, Alumix will send the door for the Guest Room wardrobes. We hope to see the glasses and mirrors fixed too.
Works completed, or near completion, so far:
Master Toilet
The granite top is up but there are still more works to be done:
- Fixing mirror
- Fixing glass
- Fixing Vanity drawers
- Fixing sanitary bowl and tap mixer
- Fixing LED lights under Vanity top
- Fixing lights above Vanity top
Guest Room
The wardrobe structure and the window low bench are completed and waiting for the Alumix sliding door and cushion seat respectively.
Dining Area
The wardrobe, which was fixed to conceal the aircond trunkings and ledges are completed. Now waiting for the electrician to fix the LED light along the ledges.
The main gate was being installed as we left. Here, is the one end of it:
Guest Toilet
The toilet paper holder and hand towel hanger have been fixed. We are not sure what is Chiauw going to do with the boxed-up. Our understanding is that it would be covered with glass. As such, we don't quite get it why the hangers were already fixed.
Study Table
The last instruction that we gave to Chiauw was not to get Uncle Chong fixed the top hung study cabinet. We decided to drop the idea so as to avoid delay.