I had a long telephone conversation with Chiauw yesterday. We both felt that there's a lot of detail that needs to be finalized:
01. The purchase of the island cooker hood
02. The choice of inner fire cooker hob or an induction cookertop or just an ordinary two burner
03. The placement, and number of units, of electrical power plugs for the whole house
04. The confirmed orders for plumbing and sanitary wares
05. The placement for the cylinder gas
06. The placement for tank heater
07. The choiced tiles for kitchen, kitchen toilet and MBR toilet
08. The choiced timber wood
09. The inner wardrobe structure for WiW, study area and Guests' room
10. The wall - colour
11. The ceiling lightings
12. The lights switches
13. The bed frame
14. The design of suspended TV console - Living and MBR
15. The tender
16. The work permit application
etc
etc
etc
We are resuming our weekly meeting this Saturday. We are looking forward to it.
The Wood Area:
So, we decided to look into the wood samples and narrowed down on our choice. Hopefully, Chiauw will guide us when we see her tomorrow.
And the choices of wood:
Our preferred choice:
01. Wood 1
02. Wood 8
03. Wood 3