Should we have moved in on 6th October, we would probably be upset today. 6th October was the second change, from 20th September (the first verbal promise for a handover was 5th September), where the Master Bedroom was supposed to be handed over to us.
The mess, basically all the carcasses for the 'wet area' kitchen cabinet, is all over the living room, dining area, guest room and the kitchen. Suddenly, we feel that the kitchen has become rather small with parts of the cabinet installed.
The Mess:
The 'Wet Area':
Where the fridge and washing machine going to be placed.
The main 'wet area':
The new gate fully installed: