With the aircon man down at the site today, in full discussion with us and Chiauw, we are now able to finalize the plan for the renovation/hacking works. Running the aircon trunks is a big headache.
It is a difficult task, for us, as we really would want to hide as many trunkings as possible in Reiki Sanctuary. Now that this issue is resolved, and that all trunkings are to be fully concealed, certain of our earlier design needs have to be changed. However, we will only make the change when the trunks are completely installed.
The problem with an old HDB flat is the limitation (a strict HDB ruling) for only one condensing unit. To top that up, there is also a requirement for low amps power point. It means that we could not have all of our five rooms installed with an air-conditioning system. We are now faced with limitations to get the right air-conditioning system, one with a bigger BTU yet HDB approved, to cool the whole of Reiki Sanctuary.
The aircon system that we will be getting:
The Schedule:
04 July
01. Chiauw is to meet with a professional engineer to probe for the hacking works.
05 July
01. Chiauw will put up notices for the renovation works. Also, she will personally go to our immediate neighbours to inform them.
02. The plumber will dismantle all the existing sanitaryware and disconnect the water supply and to provide a temporary supply for tiles/hacking contractors.
03. We are to discuss with the plumber and the electrician for their detailed layout plans.
08 July - This is also the D-day where the full renovation works will start.
01. Hacking of tiles and walls to start.
02. Renovation and renovation and renovation